Memorex LOCK - VERSION 2-24 Spécifications Page 257

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 489
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 256
Sorting with BIM-EPIC Introduction
Chapter 7. Running Jobs With BIM-EPIC 7-37
Sorting with BIM-EPIC
Introduction
This section describes the considerations necessary to use BIM-EPIC controlled datasets with
all sort programs in general and these three sort programs specifically:
SYNCSORT using BIM-EPIC Interface
IBM SORT beginning with DFSORT 3.3
CA-SORT
All sort programs check the assignment of a particular logical unit (SYSnnn) number before
actually opening a particular file (known as pre-open checking) and use PIOCS (Physical
Input Output Control Systems) to open, close, read, and write their datasets. Therefore, some
special considerations may be necessary when accessing BIM-EPIC controlled datasets with
your sort program. These considerations fall into three categories:
Satisfaction of pre-open checking
Acquisition of necessary DTF information
Deletion of the SORTWK dataset(s)
Pre-open checking can be satisfied using JCL considerations. BIM-EPIC automatically
deletes controlled SORTWK datasets at EOJ. DTF information not supplied by the sort
program either is lost or must be acquired by other means.
Description
Vue de la page 256
1 2 ... 252 253 254 255 256 257 258 259 260 261 262 ... 488 489

Commentaires sur ces manuels

Pas de commentaire