Memorex LOCK - VERSION 2-24 Informations techniques Page 269

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 568
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 268
User Reference
Connectivity Systems, Inc.—Copyright © 2006
Use Pursuant to Company Instructions
7-1
7
Running Jobs With
BIM-EPIC
BIM-EPIC is designed to work with your existing JCL. However, on
occasion, JCL changes are necessary. Some situations require special
entries in the BIM-EPIC dataset definition (EDD). This chapter discusses
how to use BIM-EPIC and JCL with products from IBM and other
third-party vendors. Recommendations for JCL and EDDs are presented
for each topic when relevant. Refer to the $INDEXSAMPJOB VSE
sub-library member as reference to the many job samples provided on the
BIM-EPIC installation tape.The member is in the same sub-library that
BIM-EPIC was installed into. Familiarity with the TLBL statement and
DLBL statement and BIM-EPIC dataset definition statements is assumed.
Chapter Contents
Dataset Considerations
Disk Processing
Tape Processing
Types of Datasets
Sort Programs
Additional Functionality
JCL Functions
Vue de la page 268
1 2 ... 264 265 266 267 268 269 270 271 272 273 274 ... 567 568

Commentaires sur ces manuels

Pas de commentaire